Railway BOQ
Bill of Quantities — Railway
KARTAA Rail Corridor Demo Project · Demo/Synthetic Data
Earthwork in excavation and embankment — Sub-grade preparation
WBS 1.1Earthwork in excavation and embankment — Sub-grade preparation
Subgrade formation — 300mm compacted layer
WBS 1.2Subgrade formation — 300mm compacted layer
Blanketing layer — 300mm sand/moorum
WBS 1.3Blanketing layer — 300mm sand/moorum
Drainage works — side drains and catch water drains
WBS 1.4Drainage works — side drains and catch water drains
Stone ballast — 40mm graded, spread and compacted
WBS 2.1Stone ballast — 40mm graded, spread and compacted
Pre-stressed concrete sleepers — 60kg/m rail
WBS 2.2Pre-stressed concrete sleepers — 60kg/m rail
Rail — UIC 60 kg/m, 13m panels, laying and linking
WBS 2.3Rail — UIC 60 kg/m, 13m panels, laying and linking
Turnouts — 1 in 12, BG, 52kg rail
WBS 2.4Turnouts — 1 in 12, BG, 52kg rail
Box culverts — 2.0m × 1.5m RCC
WBS 3.1Box culverts — 2.0m × 1.5m RCC
Road Over Bridge (ROB) — RCC T-beam, 2-lane
WBS 3.2Road Over Bridge (ROB) — RCC T-beam, 2-lane
Platform works — RCC platform, 12m wide × 600m long
WBS 4.1Platform works — RCC platform, 12m wide × 600m long
Station buildings — RCC framed structure
WBS 4.2Station buildings — RCC framed structure
OHE foundations — RCC M25, 1.2m dia × 6m deep
WBS 5OHE foundations — RCC M25, 1.2m dia × 6m deep
OHE mast erection — 9m steel mast with bracket
WBS 5OHE mast erection — 9m steel mast with bracket
Signalling — IBS, LC gates, point machines
WBS 6Signalling — IBS, LC gates, point machines
Telecom — OFC cable, SCADA, PA system
WBS 6Telecom — OFC cable, SCADA, PA system
Level crossings — interlocked, with gates and signals
WBS 7Level crossings — interlocked, with gates and signals
Railway Takeoff Module
PlannedFuture takeoff module will support railway drawing measurements: Rail length, Sleeper count, Platform area, Chainage-based quantities, Asset count.