1.1 · WBS 1.1

Earthwork in excavation and embankment — Sub-grade preparation

65%
28,00,000 ₹185₹51,80,00,000
1.2 · WBS 1.2

Subgrade formation — 300mm compacted layer

60%
9,80,000 ₹220₹21,56,00,000
1.3 · WBS 1.3

Blanketing layer — 300mm sand/moorum

40%
2,80,000 ₹380₹10,64,00,000
1.4 · WBS 1.4

Drainage works — side drains and catch water drains

50%
86,000 m₹1,200₹10,32,00,000
2.1 · WBS 2.1

Stone ballast — 40mm graded, spread and compacted

35%
2,58,000 ₹2,400₹61,92,00,000
2.2 · WBS 2.2

Pre-stressed concrete sleepers — 60kg/m rail

35%
3,44,000 Nos.₹1,850₹63,64,00,000
2.3 · WBS 2.3

Rail — UIC 60 kg/m, 13m panels, laying and linking

38%
1,72,000 m₹4,200₹72,24,00,000
2.4 · WBS 2.4

Turnouts — 1 in 12, BG, 52kg rail

25%
48 Nos.₹28,00,000₹13,44,00,000
3.1 · WBS 3.1

Box culverts — 2.0m × 1.5m RCC

66%
68 Nos.₹18,50,000₹12,58,00,000
3.2 · WBS 3.2

Road Over Bridge (ROB) — RCC T-beam, 2-lane

42%
12 Nos.₹4,20,00,000₹50,40,00,000
4.1 · WBS 4.1

Platform works — RCC platform, 12m wide × 600m long

20%
48,000 ₹3,800₹18,24,00,000
4.2 · WBS 4.2

Station buildings — RCC framed structure

20%
32,000 ₹12,500₹40,00,00,000
5.1 · WBS 5

OHE foundations — RCC M25, 1.2m dia × 6m deep

18%
3,440 Nos.₹45,000₹15,48,00,000
5.2 · WBS 5

OHE mast erection — 9m steel mast with bracket

12%
3,440 Nos.₹85,000₹29,24,00,000
6.1 · WBS 6

Signalling — IBS, LC gates, point machines

12%
1 Lot₹1,20,00,00,000₹1,20,00,00,000
6.2 · WBS 6

Telecom — OFC cable, SCADA, PA system

8%
1 Lot₹45,00,00,000₹45,00,00,000
7.1 · WBS 7

Level crossings — interlocked, with gates and signals

27%
15 Nos.₹35,00,000₹5,25,00,000
Total BOQ Value (Demo)₹5,62,29,00,000

Railway Takeoff Module

Planned

Future takeoff module will support railway drawing measurements: Rail length, Sleeper count, Platform area, Chainage-based quantities, Asset count.

Rail Length (m)
— Planned —
Sleepers (Nos.)
— Planned —
Platform Area (m²)
— Planned —
Chainage (km)
— Planned —
Asset Count