Progress Intelligence Engine

Assisted verification, never automated certification
+2
81/100

Avg KARTAA Score

Across 3 active projects

+1
2

Critical Bottlenecks

Require immediate PM action

-4%
68%

Verification Rate

Evidence submitted on time

+2
6

Anomalies Detected

This week across all projects

KARTAA Verification Score — Weekly Trend

All active projects · Jun – Aug 2026

NH-48NH-19DL Exp.

Scoring Logic by Phase

NH-48 Pkg 3 · Evidence + BOQ + Schedule components

EvidenceBOQSchedule

Risk Heatmap — Phase × Project

Verification risk level per construction phase across all active projects

ClearLowMediumHighCritical
ProjectSub-gradeSub-baseWMMDBMBC
NH-48 Pkg 3
93
Clear
91
Clear
84
Medium
Medium: Density test pending
71
High
High: GPS mismatch + low evidence
Medium
Medium: Not started
NH-19 Pkg 1
88
Low
79
Medium
Medium: Partial BOQ match
65
High
High: Evidence gap >14 days
48
Critical
Critical: No verification in 21 days
Medium
Medium: Not started
DL Exp. Pkg 2
96
Clear
94
Clear
88
Low
81
Medium
Medium: Schedule lag 8 days
72
Low

Verification Dimension Radar

Cross-project scoring across 6 verification dimensions

PM Action Required

3 bottlenecks
CRITICALNH-19 Pkg 1 · DBM Layer

Verification stalled 21 days

Assign site engineer immediately

HIGHNH-19 Pkg 1 · WMM Layer

Evidence coverage <20%

Upload minimum 6 photos per 1,000 m²

HIGHNH-48 Pkg 3 · DBM Layer

BOQ variance +18%

Cross-check drawing takeoff vs. site measurement

Performance Anomalies

Auto-detected deviations across all active projects

Stall DetectedNH-19 Pkg 131+000 – 38+500−21 days

DBM verification stalled — no entries for 21 consecutive days

Detected: 23 Aug 2026

Evidence GapNH-19 Pkg 124+500 – 28+000−82% coverage

WMM layer evidence gap: only 2 photos for 3,400 m² area

Detected: 22 Aug 2026

BOQ MismatchNH-48 Pkg 362+400 – 63+800+18% variance

DBM BOQ quantity reported 18% above drawing takeoff

Detected: 21 Aug 2026

Score DropNH-48 Pkg 362+400−4 pts

KARTAA Score dropped 4 points in 7 days — GPS mismatch flagged

Detected: 20 Aug 2026

Schedule SlipDL Exp. Pkg 214+000 – 18+500−8 days

DBM paving 8 days behind revised baseline schedule

Detected: 19 Aug 2026

Score DropNH-19 Pkg 1−7 pts

Overall KARTAA Score declined from 78 → 71 over 3 weeks

Detected: 18 Aug 2026

Intelligence scores are computed from evidence submissions, BOQ cross-references, GPS accuracy, and schedule adherence. All findings require PM review before any formal certification. KARTAA OS v1.0 — Phase 2